More Bright Ideas from Sutton Power
We were asked to provide mobile standby power to run a critical application in the event of a site wide “Blackout” (Worst case scenario). The client needed to deploy the back up power source quickly and safely with a full connection kit and tooling.
The Chieftain design (10-40kVA) was tailored to meet the power requirement as well as providing a 4 meter high pneumatic master LED light rig, secure toolbox and twin axle trailer ready to go, on standby, to cover power outages on site. UK designed and built.
Comments are currently closed.